Go To the Planning and Development Home page
Search this site...
Main Page

Applications, Forms & Documents

Boards, Commissions & Committees

Code Enforcement

Environmental Documents on Active Projects

Permit Information

Projects & Programs


Divisions

Building & Safety

Energy & Minerals

Long Range Planning


The Neighborhoods of Willow Creek & Hidden Canyon (Key Site 21)

    The project site is comprised of three undeveloped parcels (APN’s 113-250-015, -016, -017) located on a portion of Key Site 21 in the Orcutt Community Plan area. Key Site 21 is located on the south side of Highway 1 between Solomon Road and Black Road, approximately 1/2 mile west of the Highway 1/Solomon Road intersection in the Third Supervisorial District. Orcutt Rancho, LLC, is requesting approval of the following applications for the Neighborhoods of Willow Creek & Hidden Canyon Project:

    • A Specific Plan that provides for the design and regulatory framework for orderly development including housing, a public trail, open space, and biological protection measures.
    • Two Vesting Tentative Tract Maps that create a total of 146 single family residential lots and 2 open space/private roadway lots to be maintained by an HOA for a total of 148 lots.
    • Two Development Plans for the development of 146 single family residences, associated infrastructure including open space areas, and onsite water detention areas.
    • A Minor Conditional Use Permit for new entrance signs.
    • A Minor Conditional Use Permit for a new community water system.
    • A General Plan Amendment to relocate the proposed public trail staging area from the location shown in Orcutt Community Plan Figure KS 21-1 (adjacent to SR 1) to the project site.
    • A Road Naming application proposing names for the proposed private roads.

    Permit Application Numbers: 16SPP-00000-00001, 17GPA-00000-00005, 16TRM-00000-00003, 16TRM-00000-00004, 16DVP-00000-00008, 17DVP-00000-00011, 16CUP-00000-00033, 17CUP-00000-00030, 17RDN-00000-00002


    Status

      The 30-day Scoping Period for the preparation of a Draft Subsequent Environmental Impact Report (SEIR) will begin March 27, 2018 and end of April 25, 2018.

      A Scoping Meeting has been scheduled to occur on April 18, 2018 at 5:30p.m. at Planning and Development, 624 W. Foster Rd., Suite C, Santa Maria, CA 93455. The Scoping Meeting discussion will be limited to environmental concerns, the focus of the environmental document, potential mitigation measures and potential alternatives to the project.


    Schedule

      April 18, 2018 - SEIR Scoping Meeting


    Documents


    Contacts



  Send us your questions or comments. Submit a customer satisfaction survey.